Natick Charles River Dam drawdown under way, in-water work set for July 16

Thursday, July 2 — The controlled drawdown of the Charles River Dam impoundment began this week, and the town announced that in-water construction work is scheduled to start July 16. Residents passing the Charles River may notice exposed rocks and mud where water normally flows; the town has posted additional updates and video at natickma.gov. WCVB also covered the story, reporting on the unusual sight the lowered river presents to passersby: "Charles River in Natick lowered for dam removal project" (per WCVB: https://www.wcvb.com/article/natick-charles-river-dam-removal-drawdown/71811469).

Thursday, July 2 — MassDOT issued an updated notice on the Routes 27/9 interchange improvement project in Natick. Residents can find the latest construction details on the town's website at natickma.gov.

Thursday, July 2 — The town posted next week's roadway improvement schedule, covering the week of July 6. Specific streets and work windows are listed at natickma.gov.

Thursday, July 2 — The MetroWest Daily News reports on a notable commercial real estate transaction on the Route 9 corridor: "Who bought the former Party City property on Route 9 in Natick MA?" The property sold for more than $7 million, per MetroWest Daily News. (https://www.metrowestdailynews.com/story/business/real-estate/2026/07/02/former-party-city-building-route-9-natick-ma-sold-more-than-7-million-dollars/90769108007/)

Friday, July 3, 12:00–6:00 PM — A cooling center will be open at the First Congregational Church of Natick on both Friday, July 3, and Saturday, July 4, from noon to 6 p.m., in a service collaboration with the town. Residents seeking relief from the heat are welcome to drop in. Details at natickma.gov.

Saturday, July 4, Town Common — Natick will celebrate the nation's 250th birthday with a community picnic on the Town Common. The event features music, games, and a kids' parade with decorated wagons, bikes, strollers, and wheelchairs. The cooling center at First Congregational Church will also be open noon to 6 p.m. that day.

Monday, July 6 — Roadway improvement crews are scheduled to return to work across town beginning July 6; the full street-by-street schedule is posted at natickma.gov.

Thursday, July 16 — In-water construction at the Charles River Dam is set to begin, following the ongoing controlled drawdown of the impoundment that started this week.

Subscribe to The Natick MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Newton Post · The North Reading Post · The Pepperell Post · The Reading Post · The Sherborn Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.